Karnot System Work Flow Principles

Karnot Engineering Corporation, which carries out international studies on industrial wastewater reclamation and recycling of water, has been based on the philosophy of operation of Karnot theory in the aim of environmentalist organization and work flow principles.

At the synergy of chemical applications with new technology mechanical solutions in industrial wastewater processes; The main activity of the institution is the wastewater reclamation and recycling project development which is inspired by the Karnot cycle formula working on the cooling dynamics of the thermal power.

The two main objectives are; It is the target principle of the institution to design a significant amount of energy and cost efficiency in the waste water treatment plant with the aim of environmental protection and the aim of savings to be achieved by the recovery of the water will be synergistic with each other.

Karnot Engineering’s two basic environmental principles are; The significant amount of energy and cost efficiency in the wastewater treatment plant is projected to be a synergistic loop between the goal of environmental protection and the goal of saving with the recovery of water.

For this synergy, it is aimed to bring the final average values of wastewater treatment to Carnot targets. Institution; It presents a significant advantage to businesses by offering all the solutions it develops, especially businesses located in drought basins, together with measurable ‘guarantee comprehensive’ depreciation programs.

KARNOT OPTIMIZATION IN WASTE WATER PROTECTION

*Providing a color value target value with the color removal chemistries
*Bacterial population and performance at good values and color removal
*Efficient waste plant with low COD value & separation of oil from water
*TSS and heavy metal risk analysis with correct process and chemicals
*Healthy working sludge dewatering unit target low humidity level
*Target Karnot level collapse of shocks with optimized pool mixers

Karnot Treatment Steps:

1: Screening and Pumping
2: Grit Removal
3: Primary Settling
4: Aeration / Activated Sludge
5: Secondary Settling
6: Filtration
7: Disinfection
8: Oxygen Uptake

Need a detailed Check-Up?

Karnot Engineering Wastewater Analysis and Retrieval Project Check~Up Process~UP Process is 25 days.

We Make Wonderful Things for Nature.

Taking every project to a new level. Unique engineering approach to every customer with maximum care and experience.